General Information
Completion: | 1988 |
---|---|
Status: | in use |
Project Type
Structure: |
Cable-stayed bridge with fan system Swing bridge |
---|---|
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Function / usage: |
Pedestrian bridge (footbridge) |
Material: |
Steel bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Glasgow, Scotland, United Kingdom |
---|---|
Crosses: |
|
Coordinates: | 55° 51' 31.08" N 4° 17' 21.10" W |
Technical Information
Dimensions
length of movable section | 88 m |
Materials
pylon |
steel
|
---|---|
deck |
steel
|
Participants
Initial construction
Design
Steel construction
Refurbishment
Structural engineering
Relevant Web Sites
Relevant Publications
- Bell's Bridge Refurbishment. Presented at: Footbridge 2014 - Past, Present & Future, London, 16-18 July 2014. (2014):
- About this
data sheet - Structure-ID
20026271 - Published on:
19/02/2007 - Last updated on:
05/02/2016