0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: April 2009
Completion: 1 July 2011
Status: in use

Project Type

Structure: dam structure:
Mobile barrage
footbridge:
Tied-arch bridge
Function / usage: footbridge:
Pedestrian bridge (footbridge)
Material: footbridge:
Steel bridge

Location

Location: , , ,
, , ,
Impounds:
  • Oise River
Is supported by: Venette Lock
Coordinates: 49° 24' 47.64" N    2° 48' 29.68" E
Show coordinates on a map

Technical Information

There currently is no technical data available.

Participants

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20075748
  • Published on:
    03/09/2018
  • Last updated on:
    03/09/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine