0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 2018
Status: in use

Project Type

Structure: Tunnel
Function / usage: Railroad (railway) tunnel
Construction method: New Austrian Tunnelling Method (NATM)

Location

Location: , ,
Part of:
Coordinates: 31° 47' 56.88" N    35° 11' 10.68" E
Show coordinates on a map

Technical Information

Dimensions

length ca. 2.9 km
number of tubes 2

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20044778
  • Published on:
    06/04/2009
  • Last updated on:
    18/04/2019
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine