0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1962
Completion: 6 October 1965
Status: in use

Project Type

Location

Location: , ,
Address: Ernst-Reuter-Allee
Crosses:
  • Elbe River
Coordinates: 52° 7' 43.33" N    11° 38' 37.31" E
Show coordinates on a map

Technical Information

Dimensions

total length 257.70 m
span lengths 81.2 m - 130.0 m - 46.5 m
number of spans 3
number of tracks 2
number of lanes 2 x 2
roadway / carriageway width 18.0 m
track gauge 1 435 mm
deck width 30 m
girder depth 3.20 - 5.00 m

Materials

superstructure steel
piers reinforced concrete
abutments reinforced concrete

Case Studies and Applied Products

The Largest Spherical Uplift Bearings with CE Marking

The Largest Spherical Uplift Bearings with CE Marking

Due to particular static conditions, the Neue Strom-brücke in Magdeburg was equipped with extraordinary bridge bearings in the course of its rehabilitation. Since alternating tensile and compressive loads have to be transferred on the abutm ... [more]

Participants

Rehabilitation (2023)
Contractor
Bearings
Construction supervision

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20079066
  • Published on:
    19/01/2020
  • Last updated on:
    22/04/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine