0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 11 November 1857
Completion: 11 November 1858
Status: demolished

Project Type

Structure: main bridge:
Half-through truss bridge
main bridge:
Lattice truss bridge
main bridge:
Parallel-chord truss bridge
northern approach viaduct:
Segmental arch bridge
Function / usage: Railroad (railway) bridge
Material: main bridge:
Iron bridge
Structurae Plus/Pro - Subscribe Now!
northern approach viaduct:
Masonry bridge

Location

Location: , ,
Crossed:
  • Mosel River
Replaced by: Mosel River Rail Bridge (1918)
Mosel River Rail Bridge (1931)
Coordinates: 50° 21' 50.41" N    7° 35' 26.02" E
Show coordinates on a map

Technical Information

Dimensions

total length 270 m
number of tracks 2
track gauge 1 435 mm
abutments number 3
arches number of spans 6
piers number 3 + 5
truss number of spans 4

Materials

piers masonry
arches masonry
truss iron
abutments masonry

Participants

Design

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20086521
  • Published on:
    15/08/2023
  • Last updated on:
    15/08/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine