0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Cambridge Creek Bridge
Completion: 2 June 1940
Status: in use

Project Type

Structure: Double-leaf bascule bridge
Function / usage: Road bridge
Material: Steel bridge

Awards and Distinctions

1940 Honorable Mention  

Location

Location: , , ,
Address: Market Street (MD 795)
Coordinates: 38° 34' 13.36" N    76° 4' 25.29" W
Show coordinates on a map

Technical Information

Dimensions

main span 19.51 m
total length 96.01 m
deck width 7.89 m

Cost

cost of construction United States dollar 181 000

Materials

bascule span steel

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20080896
  • Published on:
    01/04/2021
  • Last updated on:
    14/11/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine