General Information
Project Type
Structure: |
Through arch bridge |
---|---|
Support conditions: |
for registered users |
Function / usage: |
Road bridge |
Material: |
Steel bridge Structurae Plus/Pro - Subscribe Now! |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Location
Technical Information
Dimensions
width | 38.5 m | |
total length | 3 575 m |
Materials
piers |
reinforced concrete
|
---|---|
arches |
steel
|
Excerpt from Wikipedia
Fuyuan Road Bridge (Chinese: 福元路大桥) is a beam arch bridge crossing over the Xiang River in Changsha, Hunan, China. It connects Yuelu District and Kaifu District. It was made of steel and concrete. The bridge has six lanes, separated by a railing.
Plans for a bridge had been made in 2008. Construction of the bridge started on September 27, 2010 and completed on May 18, 2012. It was put into operation on November 20, 2012.
Text imported from Wikipedia article "Fuyuan Road Bridge" and modified on 12 June 2023 according to the CC-BY-SA 3.0 license.
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
- About this
data sheet - Structure-ID
20085915 - Published on:
20/05/2023 - Last updated on:
24/05/2023