0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2004
Status: in use

Project Type

Location

Location: , , ,
Crosses:
  • Elizabeth River
Carries:
  • U.S. Route 1
  • U.S. Route 9
Replaces: Elizabeth River Viaduct (1929)
Coordinates: 40° 39' 24.19" N    74° 12' 37.22" W
Show coordinates on a map

Technical Information

Cost

cost of construction United States dollar 72 000 000

Materials

piers reinforced concrete
abutments reinforced concrete
main girders steel

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20012538
  • Published on:
    26/07/2004
  • Last updated on:
    07/02/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine