0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Time Lapse FIU-Sweetwater Bridge for February 2018 - Stripping Forms, Post-Tensioning

PG6 Camera Time Lapse FIU-Sweetwater Bridge for February 2018 - Stripping Forms - PG6 Feb 2018 1800X 1080P with Music *Post-tensioning activities can be seen occurring over several days on the canopy in the second half of the video* Bridge design is by Figg Bridge Engineers and it is being built by MCM. Music is "Grasshopper" by Quincas Moreira from the YouTube Audio Library

Media-ID: 368978
Created in/on: 6 March 2018
Author/Source:
YouTube
Copyright notice / License:

This creative work is copyrighted material and may not be used without explicit approval by the author and/or copyright owner.

Last updated on: 11/01/2022

More media of this structure