0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Toward Better Applicability of Public Procurement Law: Delay Claims by the Contractor and Limit of Compensation under the Performance Guarantee

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/(asce)la.1943-4170.0000490.
  • About this
    data sheet
  • Reference-ID
    10627442
  • Published on:
    05/09/2021
  • Last updated on:
    05/09/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine