0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

A Study on Factors Causing Cost Overrun of Construction Projects in Sarawak, Malaysia

Author(s):


Medium: journal article
Language(s): English
Published in: Civil Engineering and Architecture, , n. 3, v. 8
Page(s): 191-199
DOI: 10.13189/cea.2020.080301

Geographic Locations

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.13189/cea.2020.080301.
  • About this
    data sheet
  • Reference-ID
    10611880
  • Published on:
    01/07/2021
  • Last updated on:
    01/07/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine