0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Prolongación de andenes de la estación de Sant Gervasi (Barcelona)

Author(s):

Medium: journal article
Language(s): Spanish
Published in: Hormigón y acero, , n. 266, v. 63
Page(s): 31-44
Abstract:

Lengthening the Sant Gervasi Station platforms in Barcelona

In order to allow the operator of the FGC line in Barcelona to use 80 meter long convoys, it was necessary to expand the platforms of the Sant Gervasi Station. This project was executed without interrupting the operation of the line. The current tunnel was built during the 1920's and 1930's and was made of masonery and mass concrete. The final solution consisted on displacing the existing walls to the outer side of the tunnel in order to gain a width of 1.5 m. In one of the platforms the structural solution was to use a steel structure with micropiles foundation. In the other platform the existing wall was replaced by a new one. The construction of the new wall, which is located behind the existing one, requested the boring of a new microtunnel, wich was executed from a vertical well.

Keywords:
strengthening station reinforced masonry tunnel platform extension microtunnel tunnel
Available from: ACHE - Asociación Española de Ingeniería Estructural

Structures and Projects

Structurae cannot make the full text of this publication available at this time.
  • About this
    data sheet
  • Reference-ID
    10075524
  • Published on:
    03/10/2018
  • Last updated on:
    03/10/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine