0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

An integrated decision support system for building asset management based on BIM and Work Breakdown Structure

Author(s):


Medium: journal article
Language(s): English
Published in: Journal of Building Engineering, , v. 34
Page(s): 101959
DOI: 10.1016/j.jobe.2020.101959
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1016/j.jobe.2020.101959.
  • About this
    data sheet
  • Reference-ID
    10475117
  • Published on:
    15/11/2020
  • Last updated on:
    15/11/2020
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine