0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Improving Tunnel Boring Machine Tunneling Performance by Investigating the Particle Size Distribution of Rock Chips and Cutter Consumption

Author(s):
ORCID



ORCID

Medium: journal article
Language(s): English
Published in: Buildings, , n. 4, v. 14
Page(s): 1124
DOI: 10.3390/buildings14041124
Abstract:

The construction environment of deep rock tunnels is complex, and effectively enhancing tunnel boring machine (TBM) tunneling efficiency is paramount. Increasing rock-breaking efficiency and minimizing cutter consumption are essential strategies for improving TBM tunneling efficiency. Selecting suitable tunneling parameters is crucial for enhancing rock-breaking efficiency and reducing cutter consumption. Existing research on the optimization of the ratio of maximum cutter spacing to penetration (Smax/P) based on field-measured data is limited, and few studies compare and analyze the relationship between SE, CI, and the Smax/P ratio separately. Consequently, this study determined optimal tunneling parameters for various types of surrounding rock and construction environments, aiming to more accurately optimize TBM tunneling performance during construction processes based on on-site construction data. This study conducted a comparative analysis of specific energy (SE) and the coarseness index (CI). Under both working conditions, the quadratic fitting coefficients of the CI are 4.2% and 10.6% higher than those of the SE, respectively, with the CI selected to represent the particle size distribution of rock chips. Finally, taking into account both the correlations between the CI and the ratio of maximum cutter spacing to penetration (Smax/P), as well as cutter consumption and the Smax/P ratio, an optimization method for the TBM tunneling parameter was established under both dry and saturated conditions. The research findings indicate that cutter consumption exhibits an exponential increase with a higher rock Cerchar Abrasivity Index (CAI); it initially decreases as the Smax/P ratio increases and subsequently increases in both dry and saturated conditions. Instead, the CI demonstrates an initial increase and subsequent decrease as the Smax/P ratio increases. Maximizing rock-breaking efficiency and minimizing cutter consumption are crucial for improving tunneling performance. In saturated conditions, the corresponding optimal Smax/P ratio ranges are 7.055–8.319 for soft rock, 8.606–8.931 for medium–hard rock, and 13.50–14.00 for hard rock, and these optimal ranges under dry conditions are 8.495–9.457, 10.972–12.169, and 16.5–17.5 for the same rock types. This study provides optimal Smax/P ratio ranges for TBM tunneling, thereby significantly enhancing tunneling efficiency.

Copyright: © 2024 by the authors; licensee MDPI, Basel, Switzerland.
License:

This creative work has been published under the Creative Commons Attribution 4.0 International (CC-BY 4.0) license which allows copying, and redistribution as well as adaptation of the original work provided appropriate credit is given to the original author and the conditions of the license are met.

  • About this
    data sheet
  • Reference-ID
    10773558
  • Published on:
    29/04/2024
  • Last updated on:
    29/04/2024
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine