0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

How to make Monitoring more attractive to Bridge Owners

Author(s): (WENZEL Consulting Engineers GmbH Vienna Austria)
(WENZEL Consulting Engineers GmbH Vienna Austria)
Medium: journal article
Language(s): English
Published in: ce/papers, , n. 5, v. 6
Page(s): 1357
DOI: 10.1002/cepa.2766
Abstract:

There is a wide gap between bridge owners needs and scientist's desire. Monitoring based assessment of bridges has therefore not really arrived in bridge managers processes. We have to do the necessary only, work out clear objectives, present plausible explanations, offer interfaces to LCE and BIM, create standard applications with plenty of references and submit results that fit into the owners’ work process. How to do this will be explained presenting actual cases from the world longest suspension bridge (Canakkale Bridge 2023m span), several bridge cases in India and China as well as Offshore Applications.

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1002/cepa.2766.
  • About this
    data sheet
  • Reference-ID
    10767012
  • Published on:
    17/04/2024
  • Last updated on:
    17/04/2024
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine