0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Environmental protection measures during construction of the prague subway by drill-and-blast tunnelling

Author(s):

Medium: journal article
Language(s): English
Published in: Tunnelling and Underground Space Technology, , n. 4, v. 3
Page(s): 393-397
DOI: 10.1016/0886-7798(88)90011-9
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1016/0886-7798(88)90011-9.
  • About this
    data sheet
  • Reference-ID
    10110252
  • Published on:
    07/12/2018
  • Last updated on:
    07/12/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine