0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Creating a working space for modifying and maintaining the cutterhead of a large-diameter slurry shield: A case study of Beijing railway tunnel construction

Author(s):

Medium: journal article
Language(s): English
Published in: Tunnelling and Underground Space Technology, , v. 72
Page(s): 73-83
DOI: 10.1016/j.tust.2017.11.008
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1016/j.tust.2017.11.008.
  • About this
    data sheet
  • Reference-ID
    10089404
  • Published on:
    07/12/2018
  • Last updated on:
    07/12/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine