0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Comparative analysis of managers’ perception in overseas construction project risks and cost overrun in actual cases: a perspective of the Republic of Korea

Author(s): ORCID (Department of Architectural Engineering, University of Hanyang, Seoul, Republic of Korea)
ORCID (Department of Architectural Engineering, University of Hanyang, Seoul, Republic of Korea)
ORCID (Department of Architectural Engineering, University of Hanyang, Seoul, Republic of Korea)
Medium: journal article
Language(s): English
Published in: Journal of Asian Architecture and Building Engineering, , n. 4, v. 22
Page(s): 1-18
DOI: 10.1080/13467581.2022.2116940
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1080/13467581.2022.2116940.
  • About this
    data sheet
  • Reference-ID
    10692867
  • Published on:
    23/09/2022
  • Last updated on:
    30/05/2023
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine