0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Challenges and strategies involved in designing and constructing a 6 km immersed tunnel: A case study of the Hong Kong–Zhuhai–Macao Bridge

This publication lists 17 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10089965
  • Published on:
    10/10/2018
  • Last updated on:
    18/10/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine