0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

首都高速宝町オンランプ高架工事に用いた深礎ぐいと鋼製橋脚の接合方法に関する研究 (An Experimental Study on a Newly Proposed Connection Between a Steel Pier Base and a Cast-in-Place Pile with Manual Excavation for the Construction of Takaracho On-Ramp Viaduct at the Tokyo Metropolitan Expressway)

Author(s):


Medium: journal article
Language(s): Japanese
Published in: Concrete Journal (JCI), , n. 10, v. 33
Page(s): 37-47
DOI: 10.3151/coj1975.33.10_37

Structure Types

Plus

Geographic Locations

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.3151/coj1975.33.10_37.
  • About this
    data sheet
  • Reference-ID
    10441108
  • Published on:
    08/10/2020
  • Last updated on:
    08/10/2020
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine