0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Métro de Marseille: prolongement ligne 1 entre la Timone et la Fourragère

Comparaison et critères de choix entre tunnelier et méthode conventionnelle

Author(s):


Medium: conference paper
Language(s): French
Conference: AFTES - Journées techniques, Monaco, 2008
Published in:
Page(s): 141-146
Year: 2008

Structures and Projects

Structurae cannot make the full text of this publication available at this time.
  • About this
    data sheet
  • Reference-ID
    10057215
  • Published on:
    31/10/2010
  • Last updated on:
    05/03/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine