0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The Mersey Gateway Project, UK – Delivery of a Major New 3P Procured Crossing

The Mersey Gateway Project, UK – Delivery of a Major New 3P Procured Crossing
Author(s): ,
Presented at IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016, published in , pp. 2267-2274
DOI: 10.2749/stockholm.2016.2258
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.21 MB

In March 2014, Halton Borough Council announced the successful financial close and award of the contract for the Mersey Gateway Project. This had been preceded by an intense procurement process tha...
Read more

Bibliographic Details

Author(s): (Senior Bridge Engineer, CH2M, Swindon, UK)
(Group Technical Manager, Mersey Gateway Crossings Board, Halton, UK)
Medium: conference paper
Language(s): English
Conference: IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016
Published in:
Page(s): 2267-2274 Total no. of pages: 8
Page(s): 2267-2274
Total no. of pages: 8
Year: 2016
DOI: 10.2749/stockholm.2016.2258
Abstract:

In March 2014, Halton Borough Council announced the successful financial close and award of the contract for the Mersey Gateway Project. This had been preceded by an intense procurement process that had taken some 3 years and it was with immense pride that the Council made the announcement that the 30 year concession contract had been awarded. Construction of the new crossing is currently underway with its opening due in 2017.

The centrepiece of the project is a spectacular new double span 1km long cable stayed bridge over the River Mersey Estuary in the North West of England. The crossing will be tolled and includes several km of new and upgraded road. The new crossing will be a transformational project for the region, key to the economic strategy and a trigger for regeneration and investment.

Keywords:
PPP major crossing Cable Stay Bridge project delivery tolled highway Planning Application Transport and Works Act

Structures and Projects