0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Managing data workflow from concept to commission – BIM for bridges

 Managing data workflow from concept to commission – BIM for bridges
Author(s):
Presented at IABSE Symposium: Tomorrow’s Megastructures, Nantes, France, 19-21 September 2018, published in , pp. S5-143
DOI: 10.2749/nantes.2018.s5-143
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.32 MB

BIM in bridges is a new challenge. Managing data from concept to Commission can only be done if we well understand the different phases of a project, each of them needing its own special data, its ...
Read more

Bibliographic Details

Author(s): (Bentley Systems, Paris, France)
Medium: conference paper
Language(s): English
Conference: IABSE Symposium: Tomorrow’s Megastructures, Nantes, France, 19-21 September 2018
Published in:
Page(s): S5-143 Total no. of pages: 5
Page(s): S5-143
Total no. of pages: 5
DOI: 10.2749/nantes.2018.s5-143
Abstract:

BIM in bridges is a new challenge. Managing data from concept to Commission can only be done if we well understand the different phases of a project, each of them needing its own special data, its own required accuracy and specific geometry, leading to different models and often to different type of data. Transmitting common data from phase to phase must be done with a minimum loss. On the other side, it is useless to transmit data that will not be used by following phases, and an intelligent selection must be done.

Keywords:
fabrication analysis maintenance BIM IFC CAD operating Exchange format