1915 Çanakkale Bridge, Tower foundations: Independent Design Verification

 1915 Çanakkale Bridge, Tower foundations: Independent Design Verification
Author(s): , , ,
Presented at IABSE Symposium: Long Span Bridges, Istanbul, Turkey, 26-28 April 2023, published in , pp. 300-307
DOI: 10.2749/istanbul.2023.0300
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.55 MB

An Independent Design Verification (IDV) has been carried out on the 1915 Çanakkale Bridge for the DBFO contractor client DLSY JV. The bridge spans the Dardanelles in Türkiye and has a world leadin...
Read more

Bibliographic Details

Author(s): (Arup London,UK)
(Aas-Jakobsen Oslo, Norway)
(Arup London,UK)
(DL E&C (DLSY JV) Seoul, Korea)
Medium: conference paper
Language(s): English
Conference: IABSE Symposium: Long Span Bridges, Istanbul, Turkey, 26-28 April 2023
Published in:
Page(s): 300-307 Total no. of pages: 8
Page(s): 300-307
Total no. of pages: 8
Year: 2023
DOI: 10.2749/istanbul.2023.0300
Abstract:

An Independent Design Verification (IDV) has been carried out on the 1915 Çanakkale Bridge for the DBFO contractor client DLSY JV. The bridge spans the Dardanelles in Türkiye and has a world leading main span of 2023m. This paper presents the IDV for the foundations of the two main towers for the bridge. The Designer adopted an increasingly used solution wherein reinforced concrete caissons are supported on gravel mats which sit on the soil deposits which are reinforced with open ended driven steel tubes (“inclusion piles”) which are toed into stiff deep strata, this approach has been used on the Rion-Antirion bridge in Greece and the Izmit Crossing in Tukey. The IDV included: independent review of the ground investigation information; preparation of Ground Investigation Reports which included the seismic setting of the site and design spectra; and development of finite element models for the two tower foundations including (a) single pile models allowing investigation of the load path between caisson and Miocene bedrock through gravel mat, piles and more recent geological strata; and (b) full 3D FE models of the initial section of the steel towers, the reinforced concrete caisson and its geotechnical foundation for SLS, ULS, ALS (ship impact) and seismic design situations. The verification process included fruitful discussion with the Client and Designer to develop design solutions for the foundations. The bridge has been successfully opened to traffic.

Keywords:
design seismic piles foundations

Structures and Projects