0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Johnny K. W. Wong

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Olawumi, Timothy O. / Chan, Daniel W. M. / Wong, Johnny K. W. / Oshodi, Olalekan (2022): Digitalizing and greening the built environment. In: Frontiers in Built Environment, v. 8 (February 2022).

    https://doi.org/10.3389/fbuil.2022.989535

  2. Wong, Johnny K. W. / Li, Heng (2009): Development of intelligence analytic models for integrated building management systems (IBMS) in intelligent buildings. In: Intelligent Buildings International, v. 1, n. 1 (January 2009).

    https://doi.org/10.3763/inbi.2009.0011

  3. Wong, Johnny K. W. / Li, Heng (2008): Application of the analytic hierarchy process (AHP) in multi-criteria analysis of the selection of intelligent building systems. In: Building and Environment, v. 43, n. 1 (January 2008).

    https://doi.org/10.1016/j.buildenv.2006.11.019

  4. Jiang, Weiyan / Hu, Xin / Ye, Kunhui / Wong, Johnny K. W. (2016): Market Structure of International Construction Professional Services: Evidences from Top Design Firms. In: Journal of Management in Engineering (ASCE), v. 32, n. 1 (January 2016).

    https://doi.org/10.1061/(asce)me.1943-5479.0000395

  5. Olawumi, Timothy O. / Chan, Daniel W. M. / Wong, Johnny K. W. (2017): Evolution in the Intellectual Structure of BIM Research: A Bibliometric Analysis. In: Journal of Civil Engineering and Management, v. 23, n. 8 (November 2017).

    https://doi.org/10.3846/13923730.2017.1374301

  6. Creedy, Garry D. / Skitmore, Martin / Wong, Johnny K. W. (2010): Evaluation of Risk Factors Leading to Cost Overrun in Delivery of Highway Construction Projects. In: Journal of Construction Engineering and Management, v. 136, n. 5 (May 2010).

    https://doi.org/10.1061/(asce)co.1943-7862.0000160

  7. Wong, Johnny K. W. / Li, Heng (2010): Construction, application and validation of selection evaluation model (SEM) for intelligent HVAC control system. In: Automation in Construction, v. 19, n. 2 (March 2010).

    https://doi.org/10.1016/j.autcon.2009.10.002

  8. Wong, Johnny K. W. / Li, Heng / Wang, Haoran / Huang, Ting / Luo, Eric / Li, Vera (2013): Toward low-carbon construction processes: the visualisation of predicted emission via virtual prototyping technology. In: Automation in Construction, v. 33 (August 2013).

    https://doi.org/10.1016/j.autcon.2012.09.014

  9. Olawumi, Timothy O. / Chan, Daniel W. M. / Wong, Johnny K. W. / Chan, Albert P. C. (2018): Barriers to the integration of BIM and sustainability practices in construction projects: A Delphi survey of international experts. In: Journal of Building Engineering, v. 20 (November 2018).

    https://doi.org/10.1016/j.jobe.2018.06.017

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine