0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Miroslaw J. Skibniewski

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Kim, Young Joo / Skibniewski, Miroslaw J. (2023): Protest Denied: A Qualitative Meta-Analysis of Failed Challenges to Government Contracting. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 15, n. 2 (May 2023).

    https://doi.org/10.1061/jladah.ladr-925

  2. Kim, Young Joo / Skibniewski, Miroslaw J. (2023): Optimism Bias in Bidding: Contractors’ Horizontally Biased Estimating Behavior. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 15, n. 2 (May 2023).

    https://doi.org/10.1061/jladah.ladr-845

  3. Ding, Liping / Wu, Xianguo / Zhang, Limao / Skibniewski, Miroslaw J. (2015): How to protect historical buildings against tunnel-induced damage: A case study in China. In: Journal of Cultural Heritage, v. 16, n. 6 (November 2015).

    https://doi.org/10.1016/j.culher.2015.03.001

  4. Zhang, Limao / Wu, Xianguo / Ding, Lieyun / Skibniewski, Miroslaw J. (2013): A novel model for risk assessment of adjacent buildings in tunneling environments. In: Building and Environment, v. 65 (July 2013).

    https://doi.org/10.1016/j.buildenv.2013.04.008

  5. Zhang, Limao / Liu, Qian / Wu, Xianguo / Skibniewski, Miroslaw J. (2016): Perceiving Interactions on Construction Safety Behaviors: Workers’ Perspective. In: Journal of Management in Engineering (ASCE), v. 32, n. 5 (September 2016).

    https://doi.org/10.1061/(asce)me.1943-5479.0000454

  6. Chen, Jieh-Haur / Hsu, Shu-Chien / Luo, Yung-Hong / Skibniewski, Miroslaw J. (2012): Knowledge Management for Risk Hedging by Construction Material Suppliers. In: Journal of Management in Engineering (ASCE), v. 28, n. 3 (July 2012).

    https://doi.org/10.1061/(asce)me.1943-5479.0000111

  7. Golden, Sabrina K. / Skibniewski, Miroslaw J. (2010): Immigration and Construction: Analysis of the Impact of Immigration on Construction Project Costs. In: Journal of Management in Engineering (ASCE), v. 26, n. 4 (October 2010).

    https://doi.org/10.1061/(asce)me.1943-5479.0000021

  8. Yuan, Jingfeng / Skibniewski, Miroslaw J. / Li, Qiming / Zheng, Lei (2010): Performance Objectives Selection Model in Public-Private Partnership Projects Based on the Perspective of Stakeholders. In: Journal of Management in Engineering (ASCE), v. 26, n. 2 (April 2010).

    https://doi.org/10.1061/(asce)me.1943-5479.0000011

  9. Ju, Qianqian / Ding, Lieyun / Skibniewski, Miroslaw J. (2017): Optimization strategies to eliminate interface conflicts in complex supply chains of construction projects. In: Journal of Civil Engineering and Management, v. 23, n. 6 (June 2017).

    https://doi.org/10.3846/13923730.2016.1232305

  10. Liu, Hui / Skibniewski, Miroslaw J. / Wang, Mengjun (2016): Identification and Hierarchical Structure of Critical Success Factors for Innovation in Construction Projects: Chinese Perspective. In: Journal of Civil Engineering and Management, v. 22, n. 3 (March 2016).

    https://doi.org/10.3846/13923730.2014.975739

  11. Abduh, Muhamad / Skibniewski, Miroslaw J. (2002): Optimal Configuration of Electronic Networking Technologies for Supporting D/B projects. In: Journal of Civil Engineering and Management, v. 8, n. 4 (December 2002).

    https://doi.org/10.3846/13923730.2002.10531284

  12. Zhang, Limao / Wu, Xianguo / Liu, Wenli / Skibniewski, Miroslaw J. (2019): Optimal Strategy to Mitigate Tunnel-Induced Settlement in Soft Soils: Simulation Approach. In: Journal of Performance of Constructed Facilities (ASCE), v. 33, n. 5 (October 2019).

    https://doi.org/10.1061/(asce)cf.1943-5509.0001322

  13. Guo, Shengyu / Ding, Lieyun / Zhang, Yongcheng / Skibniewski, Miroslaw J. / Liang, Kongzheng (2019): Hybrid Recommendation Approach for Behavior Modification in the Chinese Construction Industry. In: Journal of Construction Engineering and Management, v. 145, n. 6 (June 2019).

    https://doi.org/10.1061/(asce)co.1943-7862.0001665

  14. Zhou, Cheng / Ding, Lieyun / Zhou, Ying / Zhang, Hantao / Skibniewski, Miroslaw J. (2019): Hybrid Support Vector Machine Optimization Model for Prediction of Energy Consumption of Cutter Head Drives in Shield Tunneling. In: Journal of Computing in Civil Engineering, v. 33, n. 3 (May 2019).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000833

  15. Russell, Jeffrey S. / Skibniewski, Miroslaw J. (1990): QUALIFIER‐1: Contractor Prequalification Model. In: Journal of Computing in Civil Engineering, v. 4, n. 1 (January 1990).

    https://doi.org/10.1061/(asce)0887-3801(1990)4:1(77)

  16. Davidson, Ian N. / Skibniewski, Miroslaw J. (1995): Simulation of Automated Data Collection in Buildings. In: Journal of Computing in Civil Engineering, v. 9, n. 1 (January 1995).

    https://doi.org/10.1061/(asce)0887-3801(1995)9:1(9)

  17. Russell, Jeffrey S. / Skibniewski, Miroslaw J. / Cozier, David R. (1990): Qualifier‐2: Knowledge‐Based System for Contractor Prequalification. In: Journal of Construction Engineering and Management, v. 116, n. 1 (March 1990).

    https://doi.org/10.1061/(asce)0733-9364(1990)116:1(157)

  18. Murtaza, Mirza B. / Fisher, Deborah J. / Skibniewski, Miroslaw J. (1993): Knowledge‐Based Approach to Modular Construction Decision Support. In: Journal of Construction Engineering and Management, v. 119, n. 1 (March 1993).

    https://doi.org/10.1061/(asce)0733-9364(1993)119:1(115)

  19. Chao, Li‐Chung / Skibniewski, Miroslaw J. (1995): Neural Network Method of Estimating Construction Technology Acceptability. In: Journal of Construction Engineering and Management, v. 121, n. 1 (March 1995).

    https://doi.org/10.1061/(asce)0733-9364(1995)121:1(130)

  20. Son, Jaeho / Skibniewski, Miroslaw J. (1999): Multiheuristic Approach for Resource Leveling Problem in Construction Engineering: Hybrid Approach. In: Journal of Construction Engineering and Management, v. 125, n. 1 (January 1999).

    https://doi.org/10.1061/(asce)0733-9364(1999)125:1(23)

  21. Skibniewski, Miroslaw J. / Tamaki, Kinya (1994): Logistics Support System for Construction Robotics Implementation. In: Computer-Aided Civil and Infrastructure Engineering, v. 9, n. 1 (January 1994).

    https://doi.org/10.1111/j.1467-8667.1994.tb00363.x

  22. Skibniewski, Miroslaw J. / Kunigahalli, Raghavan / Russell, Jeffrey S. (1993): Managing multiple construction robots with a computer. In: Automation in Construction, v. 2, n. 3 (December 1993).

    https://doi.org/10.1016/0926-5805(93)90041-u

  23. Kunigahalli, Raghavan / Russel, Jeffrey S. / Skibniewski, Miroslaw J. (1994): Motion planning for automated construction. In: Automation in Construction, v. 3, n. 1 (May 1994).

    https://doi.org/10.1016/0926-5805(94)90034-5

  24. Yu, Wen-der / Skibniewski, Miroslaw J. (1999): A neuro-fuzzy computational approach to constructability knowledge acquisition for construction technology evaluation. In: Automation in Construction, v. 8, n. 5 (June 1999).

    https://doi.org/10.1016/s0926-5805(98)00104-6

  25. Yu, Wen-der / Skibniewski, Miroslaw J. (1999): Quantitative constructability analysis with a neuro-fuzzy knowledge-based multi-criterion decision support system. In: Automation in Construction, v. 8, n. 5 (June 1999).

    https://doi.org/10.1016/s0926-5805(98)00105-8

  26. Yuan, Jingfeng / Zeng, Alex Yajun / Skibniewski, Miroslaw J. / Li, Qiming (2009): Selection of performance objectives and key performance indicators in public–private partnership projects to achieve value for money. In: Construction Management and Economics, v. 27, n. 3 (March 2009).

    https://doi.org/10.1080/01446190902748705

  27. Skibniewski, Miroslaw J. / Kassouf, Paul J. (1990): Potential for application of plastic liner plates in tunnelling works. In: Construction Management and Economics, v. 8, n. 1 (March 1990).

    https://doi.org/10.1080/01446199000000002

  28. Skibniewski, Miroslaw J. (1991): Information management system for new construction technologies. In: Construction Management and Economics, v. 9, n. 1 (February 1991).

    https://doi.org/10.1080/01446199100000004

  29. Lee, Yong-Seon / Jang, Won-Suk / Skibniewski, Miroslaw J. (2009): Noise Evaluation for Pavement Maintenance in Metropolitan Highway Bridges. In: Journal of Performance of Constructed Facilities (ASCE), v. 23, n. 3 (June 2009).

    https://doi.org/10.1061/(asce)0887-3828(2009)23:3(181)

  30. Golden, Sabrina K. / Skibniewski, Miroslaw J. (2009): Immigration and Construction: The Makeup of the Workforce in the Washington, D.C., Metropolitan Area. In: Journal of Construction Engineering and Management, v. 135, n. 9 (September 2009).

    https://doi.org/10.1061/(asce)co.1943-7862.0000058

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine