0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

B. A. K. S. Perera ORCID

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Rasanjali, W. A. / Mendis, A. P. K. D. / Perera, B. A. K. S. / Disaratna, Vijitha: Implementing enterprise resource planning for lean waste minimisation: challenges and proposed strategies. In: Smart and Sustainable Built Environment.

    https://doi.org/10.1108/sasbe-04-2022-0068

  2. Atapattu, A. M. D. S. / Hadiwattage, Chandanie / Perera, B. A. K. S. / Rajaratnam, Dilakshan: Employing criteria scoring matrix in appraising the economic return of transcending to a circular built environment. In: Smart and Sustainable Built Environment.

    https://doi.org/10.1108/sasbe-04-2023-0077

  3. Victar, Hasith Chathuranga / Perera, B. A. K. S. / Palihakkara, Asha Dulanjalie / Dewagod, Kaveesha Gihani: Roles and competencies of quantity surveyors in achieving a circular built environment: an investigation according to 3R principles. In: Smart and Sustainable Built Environment.

    https://doi.org/10.1108/sasbe-10-2022-0231

  4. Karunarathna, Deraniyagalage Chanaka / Perera, H. A. H. P. / Perera, B. A. K. S. / Disaratna, P. A. P. V. D. S.: Influence of delay in utility shifting for extension of time claims in road construction projects in Sri Lanka. In: Smart and Sustainable Built Environment.

    https://doi.org/10.1108/sasbe-07-2023-0179

  5. Ruwanpura, U. D. R. E. / Perera, B. A. K. S. (2022): Management of external stakeholders' influences in donor-funded irrigation infrastructure projects in Sri Lanka. In: Smart and Sustainable Built Environment, v. 12, n. 4 (August 2022).

    https://doi.org/10.1108/sasbe-12-2021-0235

  6. Palihakkara, Asha Dulanjalie / Perera, B. A. K. S. (2022): Risk management in guaranteed maximum price (GMP) contracts. In: Smart and Sustainable Built Environment, v. 11, n. 2 (July 2022).

    https://doi.org/10.1108/sasbe-09-2021-0176

  7. Samarakkody, Aravindi / Perera, B. A. K. S. (2021): Application of Soft Landings concept in Sri Lanka to narrow the building performance gap, enablers and barriers. In: Smart and Sustainable Built Environment, v. 12, n. 1 (September 2021).

    https://doi.org/10.1108/sasbe-03-2021-0052

  8. Gunasekara, K. A. / Perera, B. A. K. S. / Kurukulasooriya, I. N.: Gender-specific occupational stress management in construction professionals: a comparative analysis of contractor quantity surveyors work at site. In: Construction Innovation.

    https://doi.org/10.1108/ci-11-2022-0290

  9. Ruwanpura, U. D. R. E. / Perera, B. A. K. S. / Ranadewa, Tharusha: Lean tools used in administrative processes across sectors: a systematic review and insights for the construction industry. In: Construction Innovation.

    https://doi.org/10.1108/ci-03-2023-0057

  10. Abhayantha, K. I. L. / Perera, B. A. K. S. / Perera, H. A. H. P. / Palliyaguru, Roshani S.: Management of environmental risks in highway construction projects in Sri Lanka. In: Construction Innovation.

    https://doi.org/10.1108/ci-08-2022-0202

  11. Nelumdeniya, Ayesh Udayanga / Perera, B. A. K. S. / Gimhani, K. D. M.: Usage of digital technology in improving the mental health of workers on construction sites. In: Construction Innovation.

    https://doi.org/10.1108/ci-08-2022-0214

  12. Jayanetti, J. K. D. D. T. / Perera, B. A. K. S. / Waidyasekara, K. G. A. S. / Siriwardena, Mohan (2023): Critical Analysis of Lean Construction Maturity Models: A Systematic Literature Review. In: Buildings, v. 13, n. 6 (23 May 2023).

    https://doi.org/10.3390/buildings13061508

  13. Jayamaha, B. H. V. H. / Perera, B. A. K. S. / Gimhani, K. D. M. / Rodrigo, M. N. N.: Adaptability of enterprise resource planning (ERP) systems for cost management of building construction projects in Sri Lanka. In: Construction Innovation.

    https://doi.org/10.1108/ci-05-2022-0108

  14. Moragane, H. P. M. N. L. B. / Perera, B. A. K. S. / Palihakkara, Asha Dulanjalie / Ekanayake, Biyanka (2022): Application of computer vision for construction progress monitoring: a qualitative investigation. In: Construction Innovation, v. 24, n. 2 (October 2022).

    https://doi.org/10.1108/ci-05-2022-0130

  15. Perera, Hashan Pubudu / Perera, B. A. K. S. / Palihakkara, Asha Dulanjalie (2022): Financial and economic risk management in coastal land reclamation projects. In: Construction Innovation, v. 23, n. 4 (September 2022).

    https://doi.org/10.1108/ci-12-2021-0238

  16. Gunasekara, D. M. H. / Indikatiya, I. H. P. R. / Perera, B. A. K. S. / Senaratne, Sepani (2021): Managing intragroup conflicts within project design teams during pre-contract stage that effect the project deliverables in Sri Lanka. In: Construction Innovation, v. 23, n. 2 (September 2021).

    https://doi.org/10.1108/ci-05-2020-0078

  17. Perera, B. A. K. S. / Ridmika, K. I. / Wijewickrama, M. K. C. S. (2021): Life management of the quantity surveyors working for contractors at sites: female vs male. In: Construction Innovation, v. 22, n. 4 (October 2021).

    https://doi.org/10.1108/ci-05-2020-0090

  18. Abeynayake, Dilani Niroshika / Perera, B. A. K. S. / Hadiwattege, Chandanie (2021): Defining a ‘business model' in the construction context. In: Intelligent Buildings International, v. 14, n. 4 (June 2021).

    https://doi.org/10.1080/17508975.2021.1927660

  19. Nanayakkara, N. W. K. V. V. / Perera, B. A. K. S. / Illankoon, I. M. Chethana S. (2021): On-site renewable energy for industrial buildings in Sri Lanka: a life-cycle cost analysis. In: Intelligent Buildings International, v. 14, n. 4 (June 2021).

    https://doi.org/10.1080/17508975.2021.1938505

  20. Rajaratnam, D. / Weerasinghe, D. M. L. P. / Abeynayake, M. / Perera, B. A. K. S. / Ochoa, J. J. (2021): Potential use of Augmented Reality in pre-contract design communication in construction projects. In: Intelligent Buildings International, v. 14, n. 6 (April 2021).

    https://doi.org/10.1080/17508975.2021.1911776

  21. Gallage, S. D. / Devapriya, K. A. K. / Perera, B. A. K. S. (2021): A framework for the better integration of the crucial economic factors of Sri Lankan urban renewal projects. In: Intelligent Buildings International, v. 14, n. 4 (June 2021).

    https://doi.org/10.1080/17508975.2021.1902256

  22. Amarasekara, W. D. L. / Perera, B. A. K. S. / Rodrigo, M. N. N. (2018): Impact of Differing Site Conditions on Construction Projects. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 10, n. 3 (August 2018).

    https://doi.org/10.1061/(asce)la.1943-4170.0000257

  23. Perera, W. Y. / Perera, B. A. K. S. / Jayasena, N. S. (2019): Adaptability of the shared workspace concept, for office buildings in Sri Lanka. In: Intelligent Buildings International, v. 13, n. 4 (April 2019).

    https://doi.org/10.1080/17508975.2019.1588701

  24. Alwis, G. C. D. / Perera, B. A. K. S. / Gallage, S. D. / Indikatiya, I. H. P. R. (2021): Enhancing the quality of bid evaluation in government refurbishment projects. In: Intelligent Buildings International, v. 14, n. 3 (July 2021).

    https://doi.org/10.1080/17508975.2020.1753639

  25. Dewagoda, Kaveesha Gihani / Perera, B. A. K. S. / Senaratne, Sepani (2021): A "knowledge value chain" framework for contractor organisations to maximise chances of winning tenders. In: Built Environment Project and Asset Management, v. 11, n. 4 (July 2021).

    https://doi.org/10.1108/bepam-02-2020-0021

  26. Wijeratne, W. M. P. U. / Perera, B. A. K. S. / De Silva, L. (2014): Identification and assessment risks in maintenance operations. In: Built Environment Project and Asset Management, v. 4, n. 4 (September 2014).

    https://doi.org/10.1108/bepam-09-2013-0041

  27. Ekanayake, E. M. K. / Perera, B. A. K. S. (2016): Appropriate delay analysis techniques to analyse delays in road construction projects in Sri Lanka. In: Built Environment Project and Asset Management, v. 6, n. 5 (November 2016).

    https://doi.org/10.1108/bepam-08-2015-0039

  28. Hettige, Nayani / Perera, B. A. K. S. / Mallawaarachchi, Harshini (2017): A framework for adopting green leasing in developing countries: the case of Sri Lanka. In: Built Environment Project and Asset Management, v. 7, n. 4 (September 2017).

    https://doi.org/10.1108/bepam-11-2016-0059

  29. Dabarera, G. K. M. / Perera, B. A. K. S. / Rodrigo, M. N. N. (2019): Suitability of public-private-partnership procurement method for road projects in Sri Lanka. In: Built Environment Project and Asset Management, v. 9, n. 2 (June 2019).

    https://doi.org/10.1108/bepam-01-2018-0007

  30. Gunatilake, Sachie / Perera, B. A. K. S. (2018): Built environment sustainability: what’s new and what’s next?. In: Built Environment Project and Asset Management, v. 8, n. 5 (November 2018).

    https://doi.org/10.1108/bepam-11-2018-135

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine