0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Lin, Yu-Cheng (2009): Developing Case-Based Communities of Practice for Teaching the Legal Aspects of Construction: Lessons Learned in Taiwan. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 1, n. 4 (November 2009).

    https://doi.org/10.1061/(asce)1943-4162(2009)1:4(200)

  2. Lin, Yu-Cheng / Cheung, Weng-Fong (2020): Developing WSN/BIM-Based Environmental Monitoring Management System for Parking Garages in Smart Cities. In: Journal of Management in Engineering (ASCE), v. 36, n. 3 (May 2020).

    https://doi.org/10.1061/(asce)me.1943-5479.0000760

  3. Lee, Hsin-Yun / Yang, I-Tung / Lin, Yu-Cheng (2012): Laying out the occupant flows in public buildings for operating efficiency. In: Building and Environment, v. 51 (May 2012).

    https://doi.org/10.1016/j.buildenv.2011.11.005

  4. Lin, Yu-Cheng / Chang, Jun-Xiong / Su, Yu-Chih (2016): Developing Construction Defect Management System Using BIM Technology in Quality Inspection. In: Journal of Civil Engineering and Management, v. 22, n. 7 (July 2016).

    https://doi.org/10.3846/13923730.2014.928362

  5. Lin, Yu-Cheng / Lee, Hsin-Yun / Yang, I-Tung (2016): Developing As-built BIM Model Process Management System for General Contractors: A Case Study. In: Journal of Civil Engineering and Management, v. 22, n. 5 (May 2016).

    https://doi.org/10.3846/13923730.2014.914081

  6. Lin, Yu-Cheng (2015): Use of BIM Approach to Enhance Construction Interface Management: A Case Study. In: Journal of Civil Engineering and Management, v. 21, n. 2 (January 2015).

    https://doi.org/10.3846/13923730.2013.802730

  7. Lin, Yu-Cheng (2014): Construction 3d Bim-based Knowledge Management System: A Case Study. In: Journal of Civil Engineering and Management, v. 20, n. 2 (April 2014).

    https://doi.org/10.3846/13923730.2013.801887

  8. Chen, Tien-Chien / Lin, Yu-Cheng / Wang, Lung-Chuang (2012): The Analysis of BOT Strategies Based on Game Theory – Case Study on Taiwan's High Speed Railway Project. In: Journal of Civil Engineering and Management, v. 18, n. 5 (September 2012).

    https://doi.org/10.3846/13923730.2012.723329

  9. Siao, Fu-Cih / Lin, Yu-Cheng (2012): Enhancing Construction Interface Management Using Multilevel Interface Matrix Approach/ Ryšių vadybos statyboje gerinimas taikant įvairialygių ryšių matricos metodą. In: Journal of Civil Engineering and Management, v. 18, n. 1 (February 2012).

    https://doi.org/10.3846/13923730.2012.657368

  10. Lin, Lee-kuo / Chang, Chih-chiang / Lin, Yu-Cheng (2011): Structure Development and Performance Evaluation of Construction Knowledge Management System/ Statybų žinių valdymo sistema: struktūros kūrimas ir efektyvumo įvertinimas. In: Journal of Civil Engineering and Management, v. 17, n. 2 (July 2011).

    https://doi.org/10.3846/13923730.2011.576833

  11. Lin, Yu-Cheng / Yang, Hui-Hsuan (2018): A Framework for Collaboration Management of BIM Model Creation in Architectural Projects. In: Journal of Asian Architecture and Building Engineering, v. 17, n. 1 (January 2018).

    https://doi.org/10.3130/jaabe.17.39

  12. Lin, Yu-Cheng / Chen, Yen-Pei / Huang, Wan-Ting / Hong, Chia-Chun (2015): Development of BIM Execution Plan for BIM Model Management during the Pre-Operation Phase: A Case Study. In: Buildings, v. 6, n. 1 (December 2015).

    https://doi.org/10.3390/buildings6010008

  13. Lin, Yu-Cheng / Jung, Shuh / Su, Yu-Chih (2019): Construction Database-Supported and BIM-Based Interface Communication and Management: A Pilot Project. In: Advances in Civil Engineering, v. 2019 ( 2019).

    https://doi.org/10.1155/2019/8367131

  14. Tserng, H. Ping / Dzeng, Ren-Jye / Lin, Yu-Cheng / Lin, Sheng-Tai (2005): Mobile Construction Supply Chain Management Using PDA and Bar Codes. In: Computer-Aided Civil and Infrastructure Engineering, v. 20, n. 4 (July 2005).

    https://doi.org/10.1111/j.1467-8667.2005.00391

  15. Lin, Yu-Cheng (2013): Construction network-based interface management system. In: Automation in Construction, v. 30 (March 2013).

    https://doi.org/10.1016/j.autcon.2012.11.025

  16. Lin, Yu-Cheng / Lee, Hsin-Yun (2012): Developing project communities of practice-based knowledge management system in construction. In: Automation in Construction, v. 22 (March 2012).

    https://doi.org/10.1016/j.autcon.2011.10.004

  17. Tserng, H. Ping / Lin, Yu-Cheng (2004): Developing an activity-based knowledge management system for contractors. In: Automation in Construction, v. 13, n. 6 (November 2004).

    https://doi.org/10.1016/j.autcon.2004.05.003

  18. Lin, Yu-Cheng (2008): Developing construction assistant experience management system using people-based maps. In: Automation in Construction, v. 17, n. 8 (November 2008).

    https://doi.org/10.1016/j.autcon.2008.04.004

  19. Lin, Yu-Cheng / Wang, Lung-Chuang / Tserng, H. Ping (2006): Enhancing knowledge exchange through web map-based knowledge management system in construction: Lessons learned in Taiwan. In: Automation in Construction, v. 15, n. 6 (November 2006).

    https://doi.org/10.1016/j.autcon.2005.09.006

  20. Lin, Yu-Cheng / Cheung, Weng-Fong / Siao, Fu-Cih (2014): Developing mobile 2D barcode/RFID-based maintenance management system. In: Automation in Construction, v. 37 (January 2014).

    https://doi.org/10.1016/j.autcon.2013.10.004

  21. Yang, I-Tung / Lin, Yu-Cheng / Lee, Hsin-Yun (2014): Use of Support Vector Regression to Improve Computational Efficiency of Stochastic Time-Cost Trade-Off. In: Journal of Construction Engineering and Management, v. 140, n. 1 (January 2014).

    https://doi.org/10.1061/(asce)co.1943-7862.0000784

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine