0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Kim, Yong-Woo / Rhee, Byong-Duk: Incentive-based coordination for scheduled delivery in prefab construction. In: Construction Management and Economics.

    https://doi.org/10.1080/01446193.2024.2305763

  2. Kim, Minju / Zhao, Xianxiang / Kim, Yong-Woo / Rhee, Byong-Duk (2023): Blockchain-enabled supply chain coordination for off-site construction using Bayesian theory for plan reliability. In: Automation in Construction, v. 155 (November 2023).

    https://doi.org/10.1016/j.autcon.2023.105061

  3. Ho, Chung / Kim, Yong-Woo / Zabinsky, Zelda B. (2022): Prefabrication supply chains with multiple shops: Optimization for job allocation. In: Automation in Construction, v. 136 (April 2022).

    https://doi.org/10.1016/j.autcon.2022.104155

  4. Kim, Yong-Woo (2017): Analytic solution of Timoshenko beam excited by real seismic support motions. In: Structural Engineering and Mechanics, v. 62, n. 2 (April 2017).

    https://doi.org/10.12989/sem.2017.62.2.247

  5. Bae, Jin-Woo / Kim, Yong-Woo (2008): Sustainable Value on Construction Projects and Lean Construction. In: Journal of Green Building, v. 3, n. 1 (February 2008).

    https://doi.org/10.3992/jgb.3.1.156

  6. Kang, Goune / Kim, Taehoon / Kim, Yong-Woo / Cho, Hunhee / Kang, Kyung-In (2015): Statistical analysis of embodied carbon emission for building construction. In: Energy and Buildings, v. 105 (October 2015).

    https://doi.org/10.1016/j.enbuild.2015.07.058

  7. Yi, June-Seong / Kim, Yong-Woo / Lim, Ji Youn / Lee, JeeHee (2017): Activity-based life cycle analysis of a curtain wall supply for reducing its environmental impact. In: Energy and Buildings, v. 138 (March 2017).

    https://doi.org/10.1016/j.enbuild.2016.11.061

  8. Kim, Yong-Woo / Rhee, Byong-Duk (2020): The Impact of Empowering Front-Line Managers on Planning Reliability and Project Schedule Performance. In: Journal of Management in Engineering (ASCE), v. 36, n. 3 (May 2020).

    https://doi.org/10.1061/(asce)me.1943-5479.0000751

  9. Azari-N, Rahman / Kim, Yong-Woo (2012): Comparative assessment of life cycle impacts of curtain wall mullions. In: Building and Environment, v. 48 (February 2012).

    https://doi.org/10.1016/j.buildenv.2011.09.010

  10. Park, Hyoungbae / Kim, Kyeongseok / Kim, Yong-Woo / Kim, Hyoungkwan (2017): Stakeholder Management in Long-Term Complex Megaconstruction Projects: The Saemangeum Project. In: Journal of Management in Engineering (ASCE), v. 33, n. 4 (July 2017).

    https://doi.org/10.1061/(asce)me.1943-5479.0000515

  11. Azari, Rahman / Kim, Yong-Woo (2016): Integration Evaluation Framework for Integrated Design Teams of Green Buildings: Development and Validation. In: Journal of Management in Engineering (ASCE), v. 32, n. 3 (May 2016).

    https://doi.org/10.1061/(asce)me.1943-5479.0000416

  12. Kim, Taehoon / Kim, Yong-Woo / Cho, Hunhee (2016): Customer Earned Value: Performance Indicator from Flow and Value Generation View. In: Journal of Management in Engineering (ASCE), v. 32, n. 1 (January 2016).

    https://doi.org/10.1061/(asce)me.1943-5479.0000377

  13. Kim, Sang-chul / Kim, Yong-Woo / Park, Kun Soo / Yoo, Choong-Yuel (2015): Impact of Measuring Operational-Level Planning Reliability on Management-Level Project Performance. In: Journal of Management in Engineering (ASCE), v. 31, n. 5 (September 2015).

    https://doi.org/10.1061/(asce)me.1943-5479.0000326

  14. Kim, Yong-Woo / Ballard, Glenn (2010): Management Thinking in the Earned Value Method System and the Last Planner System. In: Journal of Management in Engineering (ASCE), v. 26, n. 4 (October 2010).

    https://doi.org/10.1061/(asce)me.1943-5479.0000026

  15. Kim, Byung-Soo / Kim, Yong-Woo (2015): Configuration of Earthwork Equipment Considering Environmental Impacts, Cost and Schedule. In: Journal of Civil Engineering and Management, v. 22, n. 1 (December 2015).

    https://doi.org/10.3846/13923730.2014.897964

  16. Kim, Sang-chul / Kim, Yong-Woo (2014): Computerized Integrated Project Management System for A Material Pull Strategy. In: Journal of Civil Engineering and Management, v. 20, n. 6 (December 2014).

    https://doi.org/10.3846/13923730.2013.802743

  17. Kim, Yong-Woo / Azari-N, Rahman / Yi, June-Seong / Bae, Jinwoo (2013): Environmental Impacts Comparison Between On-site Vs. Prefabricated Just-in-time (prefab-jit) Rebar Supply in Construction Projects. In: Journal of Civil Engineering and Management, v. 19, n. 5 (October 2013).

    https://doi.org/10.3846/13923730.2013.795186

  18. Kim, Sang-chul / Kim, Yong-Woo (2012): Workforce Information Database System to Support Production Planning in Construction Projects. In: Journal of Civil Engineering and Management, v. 18, n. 6 (November 2012).

    https://doi.org/10.3846/13923730.2012.725675

  19. Chung, Sang-Yeop / Kim, Se-Yun / Kim, Yong-Woo / Han, Tong-Seok (2015): Evaluation of permeability of concrete specimens affected by chloride attack using reconstruction and probabilistic description methods. Presented at: IABSE Conference: Elegance in structures, Nara, Japan, 13-15 May 2015.

    https://doi.org/10.2749/222137815815774971

  20. Kim, Yong-Woo / Min, Oak-Key (1993): Theoretical review on the spurious modes in plane-stress/strain isoparametric meshes. In: Computers & Structures, v. 49, n. 6 (December 1993).

    https://doi.org/10.1016/0045-7949(93)90018-9

  21. Choi, Kunhee / Lee, Eul‐Bum / Ibbs, C. William / Kim, Yong-Woo (2009): Multifaceted public outreach and cost–benefit analysis for its effectiveness validation. In: Construction Management and Economics, v. 27, n. 8 (August 2009).

    https://doi.org/10.1080/01446190903096591

  22. Kim, Yong-Woo / Han, Seung-Heon / Yi, June-Seong / Chang, SooWon (2016): Supply chain cost model for prefabricated building material based on time-driven activity-based costing. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 43, n. 4 (April 2016).

    https://doi.org/10.1139/cjce-2015-0010

  23. Kim, Yong-Woo / Ballard, Glenn (2005): Profit-point analysis: A tool for general contractors to measure and compare costs of management time expended on different subcontractors. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 32, n. 4 (August 2005).

    https://doi.org/10.1139/l05-021

  24. Lee, Hyun Woo / Anderson, Scott M. / Kim, Yong-Woo / Ballard, Glenn (2014): Advancing Impact of Education, Training, and Professional Experience on Integrated Project Delivery. In: Practice Periodical on Structural Design and Construction, v. 19, n. 1 (February 2014).

    https://doi.org/10.1061/(asce)sc.1943-5576.0000190

  25. Kim, Yong-Woo / Bae, Jinwoo (2010): Assessing the Environmental Impacts of a Lean Supply System: Case Study of High-Rise Condominium Construction in Korea. In: Journal of Architectural Engineering (ASCE), v. 16, n. 4 (December 2010).

    https://doi.org/10.1061/(asce)ae.1943-5568.0000024

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine