0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Kim, Jonghyeob / Han, Sangwon / Hyun, Chang-Taek (2019): Identification and Reduction of Synchronous Replacements in Life-Cycle Cost Analysis of Equipment. In: Journal of Management in Engineering (ASCE), v. 35, n. 1 (January 2019).

    https://doi.org/10.1061/(asce)me.1943-5479.0000673

  2. Chi, Seokho / Han, Sangwon / Kim, Dae Young / Shin, Yoonjung (2015): Accident Risk Identification and its Impact Analyses for Strategic Construction Safety Management. In: Journal of Civil Engineering and Management, v. 21, n. 4 (March 2015).

    https://doi.org/10.3846/13923730.2014.890662

  3. Lee, Kwang-Pyo / Lee, Hyun-Soo / Park, Moonseo / Kim, Hyunsoo / Han, Sangwon (2014): A Real-time Location-based Construction Labor Safety Management System. In: Journal of Civil Engineering and Management, v. 20, n. 5 (October 2014).

    https://doi.org/10.3846/13923730.2013.802728

  4. Aljassmi, Hamad A. / Han, Sangwon (2014): Classification and Occurrence of Defective Acts in Residential Construction Projects. In: Journal of Civil Engineering and Management, v. 20, n. 2 (April 2014).

    https://doi.org/10.3846/13923730.2013.801885

  5. Lee, SangHyun / Han, Sangwon / Peña-Mora, Feniosky (2009): Integrating Construction Operation and Context in Large-Scale Construction Using Hybrid Computer Simulation. In: Journal of Computing in Civil Engineering, v. 23, n. 2 (March 2009).

    https://doi.org/10.1061/(asce)0887-3801(2009)23:2(75)

  6. An, Soobae / Ji, Soungmin / Hyun, Changtaek / Han, Sangwon (2015): A model-based productivity improvement of reinforced concrete work in a multi-housing project. In: KSCE Journal of Civil Engineering, v. 19, n. 5 (February 2015).

    https://doi.org/10.1007/s12205-015-0302-7

  7. Park, Moonseo / Yang, Youngjun / Lee, Hyun-Soo / Han, Sangwon / Ji, Sae-Hyun (2012): Floor-Level Construction Material Layout Planning Model Considering Actual Travel Path. In: Journal of Construction Engineering and Management, v. 138, n. 7 (July 2012).

    https://doi.org/10.1061/(asce)co.1943-7862.0000493

  8. Aljassmi, Hamad / Han, Sangwon (2013): Analysis of Causes of Construction Defects Using Fault Trees and Risk Importance Measures. In: Journal of Construction Engineering and Management, v. 139, n. 7 (July 2013).

    https://doi.org/10.1061/(asce)co.1943-7862.0000653

  9. Chi, Seokho / Han, Sangwon / Kim, Dae Young (2013): Relationship between Unsafe Working Conditions and Workers' Behavior and Impact of Working Conditions on Injury Severity in U.S. Construction Industry. In: Journal of Construction Engineering and Management, v. 139, n. 7 (July 2013).

    https://doi.org/10.1061/(asce)co.1943-7862.0000657

  10. Park, Moonseo / Ha, Sungbong / Lee, Hyun-Soo / Choi, Yoon-ki / Kim, Hyunsoo / Han, Sangwon (2013): Lifting demand-based zoning for minimizing worker vertical transportation time in high-rise building construction. In: Automation in Construction, v. 32 (July 2013).

    https://doi.org/10.1016/j.autcon.2013.01.010

  11. Park, Moonseo / Kim, Woo-Young / Lee, Hyun-Soo / Han, Sangwon (2011): Supply chain management model for ready mixed concrete. In: Automation in Construction, v. 20, n. 1 (January 2011).

    https://doi.org/10.1016/j.autcon.2010.07.005

  12. Aljassmi, Hamad / Han, Sangwon / Davis, Steven (2014): Project Pathogens Network: New Approach to Analyzing Construction-Defects-Generation Mechanisms. In: Journal of Construction Engineering and Management, v. 140, n. 1 (January 2014).

    https://doi.org/10.1061/(asce)co.1943-7862.0000774

  13. Peña-Mora, Feniosky / Han, Sangwon / Lee, SangHyun / Park, Moonseo (2008): Strategic-Operational Construction Management: Hybrid System Dynamics and Discrete Event Approach. In: Journal of Construction Engineering and Management, v. 134, n. 9 (September 2008).

    https://doi.org/10.1061/(asce)0733-9364(2008)134:9(701)

  14. Jin, RunZhi / Han, Sangwon / Hyun, Changtaek / Cha, Yongwoon (2016): Application of Case-Based Reasoning for Estimating Preliminary Duration of Building Projects. In: Journal of Construction Engineering and Management, v. 142, n. 2 (February 2016).

    https://doi.org/10.1061/(asce)co.1943-7862.0001072

  15. Aljassmi, Hamad / Han, Sangwon / Davis, Steve (2016): Analysis of the Complex Mechanisms of Defect Generation in Construction Projects. In: Journal of Construction Engineering and Management, v. 142, n. 2 (February 2016).

    https://doi.org/10.1061/(asce)co.1943-7862.0001042

  16. Kim, Jonghyeob / Han, Sangwon / Hyun, Changtaek (2016): Minimizing Fluctuation of the Maintenance, Repair, and Rehabilitation Cost Profile of a Building. In: Journal of Performance of Constructed Facilities (ASCE), v. 30, n. 3 (June 2016).

    https://doi.org/10.1061/(asce)cf.1943-5509.0000775

  17. Han, Sangwon / Lee, SangHyun / Peña-Mora, Feniosky (2012): Identification and Quantification of Non-Value-Adding Effort from Errors and Changes in Design and Construction Projects. In: Journal of Construction Engineering and Management, v. 138, n. 1 (January 2012).

    https://doi.org/10.1061/(asce)co.1943-7862.0000406

  18. Jin, RunZhi / Han, Sangwon / Hyun, Changtaek / Kim, JiHoon (2014): Improving Accuracy of Early Stage Cost Estimation by Revising Categorical Variables in a Case-Based Reasoning Model. In: Journal of Construction Engineering and Management, v. 140, n. 7 (July 2014).

    https://doi.org/10.1061/(asce)co.1943-7862.0000863

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine