0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

From the Drone to the BIM-Model - A Method for Creating As-Is Models in Bridge Construction for the Use Case of Digital Bridge Inspection

 From the Drone to the BIM-Model - A Method for Creating As-Is Models in Bridge Construction for the Use Case of Digital Bridge Inspection
Autor(en): , ,
Beitrag für IABSE Symposium: Construction’s Role for a World in Emergency, Manchester, United Kingdom, 10-14 April 2024, veröffentlicht in , S. 980-987
DOI: 10.2749/manchester.2024.0980
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.19 MB

The implementation of Building Information Management in bridge construction and public administration continues to progress. As part of the research project "Public Administration 4.0", a prototyp...
Weiterlesen

Bibliografische Angaben

Autor(en): (University of Applied Science FH Campus Wien, Austria)
(University of Applied Science FH Campus Wien, Austria)
(University of Applied Science FH Campus Wien, Austria)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Symposium: Construction’s Role for a World in Emergency, Manchester, United Kingdom, 10-14 April 2024
Veröffentlicht in:
Seite(n): 980-987 Anzahl der Seiten (im PDF): 8
Seite(n): 980-987
Anzahl der Seiten (im PDF): 8
DOI: 10.2749/manchester.2024.0980
Abstrakt:

The implementation of Building Information Management in bridge construction and public administration continues to progress. As part of the research project "Public Administration 4.0", a prototype for digital bridge inspection was developed for this purpose, based on the creation of BIM models of existing bridge structures. International studies attest to the method of photogrammetric point cloud generation based on drone images, for the intended use of existing bridge modelling, a high potential. In the course of a feasibility study, a creation process chain - with the drone to the BIM model - could be derived and the results generated could be considered applicable. The creation process consists of three sequential phases: as-is data acquisition, point cloud generation, and as-is modelling. The generated as-is model of the bridge can be implemented in a BIM software and used for digital bridge inspection and additional use cases.

Stichwörter:
Brückeninspektion Photogrammetrie BIM Drohne