Advertisement
Doka Group
The following reports and case studies provided by "Doka Group" are available:
Doka Forms Gigantic Energy Project in Icy North
On a remote location, where a mighty river plunges 15 meters into seething foam, spilling an average of approx. 459,660 gallons per second, Canada' ... [more]
Doka is forming Sabah Al Salam University in Kuwait
Education is a society's greatest asset. Kuwait is signalling intent for investment beyond oil reserves: With its new university campus, the desert ... [more]
Premiere in Russia: Heavy-duty bracket HDC for pier heads
The 46.6 km Western High Speed Diameter is the largest infrastructure project in St. Petersburg, Russia. The highway will create a quick connection ... [more]
An X Marks the new Hub for Abu Dhabi
In the Emirate of Abu Dhabi, the Vision 2030 growth plan plunges ahead with a project that lies at the core of the strategy to increase economic de ... [more]
Aquis Plaza Aachen: A major project in the tightest of spaces
The Aquis Plaza shopping center is being built in the middle of Aachen's pedestrian zone and is designed to integrate architecturally and urbanisti ... [more]
Linking the Islands: Lusail pedestrian bridges, Qatar
In 2005 Qatar has started a new city development project. Located on the coast and in the northern part of Doha, will soon to become a new city wit ... [more]
High-Performing, Cost-Efficient Solutions for Underwater Tunnel Construction
To relieve the chronic congestion in and around the existing two-lane Midtown Tunnel in downtown Norfolk, Va., rehabilitation of the tunnel is plan ... [more]
Corridor Vc: High-performing wagon for high speed
In the future, travelling between Budapest and Southern Dalmatia will take less time thanks to the Pan-European Corridor Vc. Numerous tunnels and ... [more]
Doka has won another landmark, the super-high-rise Lokhandwala Minerva building in Mumbai
Looming out of a 12-storey parking podium, the skyscraper will top out at 300 m and feature 82 storeys in two separate towers. Named the ‘Minerva ... [more]
Smooth progress on site despite extreme superstructure dimensions
Doka cantilever forming traveller scores top marks for high adaptability and short cycle times on a huge bridge superstructure in Nitra, Slovakia ... [more]