0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Rheinbabenbrücke
Beginning of works: 1915
Completion: 27 July 1917
Status: destroyed (10 March 1945)

Project Type

Structure: Cantilever truss bridge
Through truss bridge
Function / usage: Road bridge
Material: Steel bridge

Location

Location: , , ,
Crossed:
  • Rhine River
Replaced by: Wesel Bridge (1952)

Technical Information

Dimensions

main span 150 m
total length 510 m
number of spans 6

Materials

deck steel

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20008153
  • Published on:
    16/02/2003
  • Last updated on:
    04/08/2020
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine