0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Talbrücke Warnow
Official designation: BW 2818/8
Beginning of works: August 1997
Completion: April 2000
Duration of works: 34 months
Status: in use

Project Type

Location

Location: , , , ,
Crosses:
  • Warnow River
Part of:
Coordinates: 54° 1' 13.62" N    12° 8' 1.05" E
Show coordinates on a map

Technical Information

Dimensions

total length 930.1 m
span lengths 28.0 m - 2 x 24.6 m - 10 x 32.3 m - 37.3 m - 50.5 m - 74.0 m - 50.5 m - 9 x 32.3 m - 26.6 m
clearance 13 m
number of spans 27
bridge surface 26 117 m²
deck deck depth 1.60 - 3.90 m
deck width 11.82 m

Cost

cost of construction German Mark 47 400 000
cost of construction per m² German Mark 1 810

Materials

piers reinforced concrete
deck of main bridge prestressed concrete
deck of approach viaducts prestressed concrete
abutments reinforced concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20011516
  • Published on:
    28/02/2004
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine