0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 1982
Status: in use

Project Type

Structure: Rising sector gate barrage
Function / usage: Flood barrier

Location

Location: , , , ,
Impounds:
  • Thames River
Coordinates: 51° 29' 41.34" N    0° 2' 14.12" E
Coordinates: 51° 29' 58.82" N    0° 2' 12.01" E
Show coordinates on a map

Technical Information

Dimensions

total length 520 m

Cost

cost of construction Pound sterling 535 000 000

Chronology

1984

Inauguration by Queen Elizabeth II.

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20005653
  • Published on:
    30/09/2002
  • Last updated on:
    29/07/2014
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine