General Information

Beginning of works: March 2010
Completion: 27 August 2013
Status: in use

Project Type

Structure: Cable-stayed bridge with semi-fan system
Function / usage: Road bridge
Material: main bridge:
Steel-reinforced concrete composite bridge
approaches:
Prestressed concrete bridge

Geographic Information & Related Structures

Location: Schönebeck (Elbe), Salzlandkreis, Saxony-Anhalt, Germany
Address: B 246a
Crosses:
  • Elbe River
Coordinates: 52° 1' 24.52" N    11° 45' 29.68" E

Technical Information

Dimensions

main span 185 m
total length 1 128.50 m
deck width 11.60 m
bridge surface 13 091 m²
main bridge total length 489.00 m
span lengths 34 m - 4 x 38 m - 3 x 40 m - 185 m
northern approach total length 330.50 m
span lengths 36 m - 6 x 43 m - 36 m
piles diameter 1.20 m
pylon pylon height 73.3 m
southern approach total length 309.00 m
span lengths 32 m - 44 m - 34 m - 39 m - 3 x 42 m - 34 m

Quantities

deck of approaches concrete volume 11 670 m³
reinforcing steel 1 270 t
longitudinal prestressing 366 t
deck of main bridge structural steel 1 120 t
concrete volume 655 m³
reinforcing steel 230 t
parapets concrete volume 1 280 m³
reinforcing steel 185 t
piles total length of piles 200 m
pylon structural steel 180 t
concrete volume 1 070 m³
reinforcing steel 340 t
stay cables steel for cable-stays 180 t
substructure concrete volume 7 690 m³
reinforcing steel 930 t

Design Loads

live load LM 1
design code(s) DIN FB 101

Cost

cost of construction (incl. taxes) Euro 31 400 000

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20056396
  • Date created
    27/04/2010
  • Last Update
    17/05/2015