0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: March 1998
Completion: May 2000
Duration of works: 27 months
Status: in use

Project Type

Structure: Draw bridge
deck of approach viaducts:
Single T-section girder bridge
Support conditions:
Function / usage: Road bridge
Material: Reinforced concrete bridge
Steel bridge
Plan view: Structurae Plus/Pro - Subscribe Now!

Location

Location: , , ,
Crosses:
  • Peene River
Coordinates: 53° 54' 26" N    13° 1' 43" E
Show coordinates on a map

Technical Information

Dimensions

total length 34.31 m
span lengths 9.37 m - 15.46 m - 9.48 m
number of spans 3
bridge surface 456 m²
deck deck width 13.30 m
piles total length 1 710 m

Quantities

deck structural steel 283 t
concrete volume 225 m
reinforcing steel 180 t
substructure concrete volume 490 m³
sheet piling 2 630 m²

Design Loads

live load Brückenklasse 60/30
design code(s) DIN 1072

Cost

cost of construction German Mark 12 500 000

Materials

substructure reinforced concrete
deck of approach viaducts reinforced concrete
bascule span steel

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20004062
  • Published on:
    02/07/2002
  • Last updated on:
    20/03/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine