0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1959
Completion: 2 October 1964
Status: in use

Project Type

Awards and Distinctions

Location

Location: , ,
Crosses:
  • Parramatta River
Coordinates: 33° 50' 32.08" S    151° 8' 52.88" E
Show coordinates on a map

Technical Information

Dimensions

main span 305 m
total length 488 m
clearance 40.7 m

Materials

arch reinforced concrete

Chronology

20 April 1962

J.A.L. Shaw replaces H.M. Sherrard as chief engineer.

Notes

The bridge was the longest-spanning single concrete arch bridge when completed.

Participants

Owner
Design
Consulting
Contractor

Relevant Web Sites

Relevant Publications

More publications...
  • About this
    data sheet
  • Structure-ID
    20000488
  • Published on:
    13/11/1999
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine