The PERI tunnel formwork solution allows construction of the Malmö city tunnel in 10-day cycles. Bottom plate and external walls can be completed in one operational sequence – the tunnel slab is subsequently constructed using two PERI slab formwork carriages.
ID: 72740

The PERI tunnel formwork solution allows construction of the Malmö city tunne...

The variable PERI VARIO GT 24 girder wall formwork can be positioned exactly by means of the formwork carriage. The procedure is carried out by heavy-duty rollers on rails, on the concrete sub-base at the front and on the finished bottom plate at the rear.
ID: 72741

The variable PERI VARIO GT 24 girder wall formwork can be positioned exactly ...

The southern entrance area is being constructed using the cut-and-cover method for a length of around 1.5 kilometres. With the two PERI formwork carriages, the walls and slabs of the two separate tunnels can be cost-effectively concreted in one pour.
ID: 72742

The southern entrance area is being constructed using the cut-and-cover metho...

ith the two PERI formwork carriages, the 15 m long casting segments are constructed very efficiently. Hydraulically-operated raise and lowering equipment ensure time and cost-saving moving procedures. The PERI construction can be continuously adapted to the varying cross-sectional dimensions.
ID: 72743

ith the two PERI formwork carriages, the 15 m long casting segments are const...