Creugenat Viaducts
General Information
| Structural Type: |
Box girder bridge
|
|---|---|
| Function / usage: |
Motorway bridge / freeway bridge
|
| Construction method: |
Balanced cantilever method
|
| Other name(s): | Viaducs du Creugenat |
| Built: | 2008 - 2010 |
| Status: | completed |
Geographic Information & Related Structures
| Location: |
Courtedoux, Jura, Switzerland, Europe |
|---|---|
| Address: | A 16 |
| Coordinates: | 47° 23' 52.00" N 7° 1' 55.00" E |
Technical Information
Dimensions
| main span | 104 m | |
| bridge 1 | length | 559 m |
| bridge 2 | length | 545 m |
| deck | width | 11.55 m |
| roadway / carriageway width | 2 x 3.75 m | |
| piers | height | max. 5.70 m |
| number | 2 x 7 |
Cost
| cost of construction | Swiss Franc 31 560 000 |
Materials
| deck |
prestressed concrete
|
|---|
Participants
Alternative design
Structural engineering
Initial construction (2008-2010)
Scaffolding
Relevant Web Sites
Relevant Publications
There is no relevant literature listed in the database.
Internal Information
| Structure-ID: | s0063947 |
|---|---|
| Created: | 17/09/2012 |
| Last Updated: | 05/03/2013 |
