Steinachtalbrücke
General Information
| Structural Type: |
Single-cell prestressed concrete box girder bridge
|
|---|---|
| Function / usage: |
Road bridge
|
| Construction method: |
Incremental launching
|
| Built: | 2008 - 2009 |
| Duration of works: | 15 months |
| Status: | in use |
Geographic Information & Related Structures
| Location: |
Schneckenlohe, Kronach (Kreis), Bavaria, Germany, Europe |
|---|---|
| Address: | B 303 |
| Coordinates: | 50° 12' 51.00" N 11° 13' 15.00" E |
Technical Information
Dimensions
| total length | 229.00 m | |
| span lengths | 42.50 m - 3 x 48.00 m - 42.50 m | |
| deck width | 11.50 m | |
| horizontal radius of curvature | 330 m | |
| bridge surface | 2 634 m2 |
Quantities
| piles | concrete volume | 1 250 m3 |
| reinforcing steel | 85 t | |
| substructure | concrete volume | 1 270 m3 |
| reinforcing steel | 180 t | |
| superstructure | concrete volume | 1 875 m3 |
| prestressing steel | 86 t | |
| reinforcing steel | 350 t |
Cost
| cost of construction | ca. Euro 4 500 000 |
Materials
| deck |
prestressed concrete
|
|---|
Participants
Owner
Client
Design
Structural engineering
Geotechnical/geological experts
Contractor
Site supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 2010, Bundesministerium für Verkehr, Bau und Stadtentwicklung, Berlin (Germany); pp. 95-106
Internal Information
| Structure-ID: | s0060642 |
|---|---|
| Created: | 14/07/2011 |
| Last Updated: | 27/02/2013 |
