Talbrücke Mühlenbach
General Information
| Structural Type: |
Double T-section girder bridge
|
|---|---|
| Function / usage: |
Motorway bridge / freeway bridge
|
| Construction method: |
Formwork carriage
|
| Built: | 2007 - 2009 |
| Duration of works: | 25 months |
| Status: | in use |
Geographic Information & Related Structures
| Location: |
Bibow, Amt Neukloster-Warin, Nordwestmecklenburg, Mecklenburg-Western Pomerania, Germany, Europe |
|---|---|
| Part of: | |
| Coordinates: | 53° 46' 30.00" N 11° 35' 57.00" E |
Technical Information
Dimensions
| total length | 501.00 m | |
| span lengths | 29.50 m - 13 x 34.00 m - 29.50 m | |
| bridge surface | 14 279 m2 | |
| deck | girder depth | 1.60 m |
| total width | 28.50 m | |
| roadway / carriageway width | 2 x 11.50 m |
Quantities
| concrete volume | 20 300 m3 | |
| prestressing steel | 380 t | |
| reinforcing steel | 2 420 t | |
| foundations | total length of piles | 7 000 m |
Cost
| cost of construction | ca. Euro 17 400 000 |
Materials
| deck |
prestressed concrete
|
|---|
Participants
Owner
Client
Design
Structural engineering
Geotechnical/geological experts
Checking engineering
Contractor
Site supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 2010, Bundesministerium für Verkehr, Bau und Stadtentwicklung, Berlin (Germany); pp. 3-14
Internal Information
| Structure-ID: | s0060638 |
|---|---|
| Created: | 14/07/2011 |
| Last Updated: | 05/03/2013 |
