Prai Swing Bridge
General Information
| Structural Type: |
Swing bridge
|
|---|---|
| Function / usage: |
Railroad (railway) bridge
|
| Construction began in: | 2011 |
| Status: | under construction |
Geographic Information & Related Structures
| Location: |
Butterworth, Penang, Malaysia, Asia |
|---|---|
| Crosses |
|
Technical Information
Dimensions
| total length | 282 m | |
| swing span | span lengths | 2 x 45.000 m |
| length of movable section | 90.000 m |
Materials
| swing span |
steel
|
|---|
Participants
Consulting engineers
Co-contractor
Steel construction
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Design of an electrified double-track railway swing bridge in Malaysia, in "Steel Construction", March 2011, n. 1 v. 4
Internal Information
| Structure-ID: | s0060422 |
|---|---|
| Created: | 23/06/2011 |
| Last Updated: | 27/02/2013 |
