Miaoziping Bridge

No images are currently available for this data page. If you would like to help us illustrate this page, do not hesitate to send us your images!

General Information

Structural Type: main bridge:
Girder bridge
approaches:
T-section girder bridge
Function / usage: Road bridge
Construction method: main bridge:
Balanced cantilever method
approaches:
Precast girders with cast-in-situ slab
Construction began in: 2003
Status: under construction

Geographic Information & Related Structures

Location: Dujiangyan, Sichuan, China, Asia

Technical Information

Dimensions

total length 1 436 m
approaches standard span lengths 50 m
main bridge span lengths 125 m - 220 m - 125 m
piers height max. > 100 m

Materials

deck of main bridge prestressed concrete
deck of approach precast prestressed concrete

Chronology

12 May 2008, 14:28

A 8.0 magnitude (Richter scale) earthquake strikes the Wenchuan area of Sichuan province. While still under construction, though nearly finished, the bridge is damaged as one approach span is entirely unseated and collapses into the lake below.

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

Internal Information

Structure-ID: s0049507
Created: 08/12/2009
Last Updated: 27/02/2013