Kampong Pandan Flyover
General Information
| Structural Type: |
Box girder bridge
|
|---|---|
| Function / usage: |
Road bridge
|
| Construction method: |
Balanced cantilever method
|
| Completed in: | 2008 |
| Status: | in use |
Geographic Information & Related Structures
| Location: |
Kuala Lumpur, Kuala Lumpur, Malaysia, Asia |
|---|
Technical Information
Dimensions
| total length | 568 m | |
| number of spans | 12 | |
| deck | girder depth | 2.4 - 3.2 m |
| Section | total length | 192.0 m |
| total length | 240.0 m | |
| total length | 136.0 m | |
| span lengths | 40.0 m - 2 x 56.0 m - 40.0 m | |
| span lengths | 40.0 m - 2 x 56.0 m - 48.0 m - 40.0 m | |
| span lengths | 40.0 m - 56.0 m - 40.0 m |
Materials
| deck |
prestressed concrete
|
|---|
Participants
Owner
Structural engineering
- VE Consult Sdh Bhd (foundations)
Structural design
Main contractor
Prestressing
Construction management
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Kampong Pandan Flyover, Kuala Lumpur, Malaysia, in "Structural Engineering International", February 2009, n. 1 v. 19
Internal Information
| Structure-ID: | s0049503 |
|---|---|
| Created: | 08/12/2009 |
| Last Updated: | 27/02/2013 |
