0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: June 2007
Completion: 29 September 2010
Status: in use

Project Type

Location

Location: , ,
Crosses:
  • Yellow River
Coordinates: 34° 55' 8.26" N    113° 44' 58.12" E
Show coordinates on a map

Technical Information

Dimensions

total length 9.17 km
main bridge
total length 1 684.35 m
1st section span lengths 120 m - 5 x 168 m - 120 m
2nd section span lengths 5 x 120 m
number of spans 5

Quantities

structural steel 26 970 t
concrete volume 14 109 m³
stay cables steel for cable-stays 214.45 t

Design Loads

lower deck design speed 350 km/h
live load 2 x 0.8 UIC
upper deck design speed 100 km/h

Materials

piers reinforced concrete
pylons steel
deck truss steel
deck slab concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20049468
  • Published on:
    06/12/2009
  • Last updated on:
    21/05/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine