Talbrücke Feuchter Grund
General Information
| Structural Type: |
T-section girder bridge
|
|---|---|
| Function / usage: |
Motorway bridge / freeway bridge
|
| Construction method: |
Span-by-span in-situ casting on standard falsework
|
| Built: | 2003 - 2006 |
| Status: | in use |
Geographic Information & Related Structures
| Location: |
Schleusingen, Hildburghausen (Kreis), Thuringia, Germany, Europe |
|---|---|
| Part of: |
Technical Information
Dimensions
| total length | 147 m | |
| span lengths | 32.75 m - 2 x 40.75 m - 32.75 m | |
| height above valley floor or water | 28 m | |
| total width | 28.50 m |
Materials
| deck |
prestressed concrete
|
|---|---|
| piers |
reinforced concrete
|
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
There is no relevant literature listed in the database.
Internal Information
| Structure-ID: | s0048929 |
|---|---|
| Created: | 03/11/2009 |
| Last Updated: | 27/02/2013 |
