Montabliz Viaduct
General Information
| Structural Type: |
Box girder bridge
|
|---|---|
| Function / usage: |
Motorway bridge / freeway bridge
|
| Construction method: |
Balanced cantilever method
|
| Other name(s): | Viaducto de Montabliz |
| Completed in: | 2008 |
| Status: | in use |
Geographic Information & Related Structures
| Location: |
Bárcena de Pie de Concha, Cantabria, Spain, Europe Pesquera, Cantabria, Spain, Europe |
|---|
Technical Information
Dimensions
| total length | 721 m | |
| span lengths | 110 m - 155 m - 175 m - 155 m - 126 m | |
| pier 2 | height | 145 m |
Quantities
| concrete volume | 45 960 m3 | |
| prestressing steel | 128 t | |
| reinforcing steel | 1 419 t |
Cost
| cost of construction | Euro 23 000 000 |
Materials
| deck |
prestressed concrete
|
|---|---|
| piers |
reinforced concrete
|
Participants
Owner
Design
Wind tunnel testing
Consulting engineers
Contractor
Formwork & scaffolding
Relevant Web Sites
Relevant Publications
- Viaducto de Montabliz, presented at IV Congreso de la Asociación Científico-Tecnica del Hormigón Estructural - Congreso Internacional de Estructuras, Valencia, 24-27.11.2008.
- Montabliz Viaduct, Cantabria (Spain), in "Structural Engineering International", August 2008, n. 3 v. 18