 |  |  |
Bombi Bridge |
| Galana River Footbridge |
 |
|
Built:
|
2008
- 2009
|
| Status: |
in use
|
|
Location: |
Over the Galana river near the Sala Gate to Tsavo Park, 80km west of Malindi and 16km east of the ADC river crossing in in eastern Kenya
|
|
|
|
Structural Type:
|
|
|
Function / usage:
|
|

|

|
| Description | Value |
|
| |
width |
1.08 m | | |
length |
111.65 m |
| pier |
height |
3.0 m |
| tower |
height |
11.05 m |
|

| This project represents the first application of the Helvetas Nepal BBLL (Bridge Building at the Local Level) N-Type suspension bridge outside of the Himalayan region. |
| The bridge was built entirely using hand tools, diesel powered generator/welder, diesel powered concrete mixer, abney level, builder's level; all concrete was placed by hand and all excavation was done using hand tools only. |
|

|

 |
Leap of faith, in
"Bridge Design & Engineering", 3rd Quarter 2009, n. 56 v. 15 .
|
|