A 1 Lenne Bridge
General Information
| Structural Type: |
main bridge: Double-cell box grider bridge approach: T-section girder bridge |
|---|---|
| Function / usage: |
Motorway bridge / freeway bridge
|
| Other name(s): | Lennebrücke |
| Built: | 2006 - 2009 |
| Status: | in use |
Geographic Information & Related Structures
| Location: |
Hagen, North Rhine-Westphalia, Germany, Europe |
|---|---|
| Crosses |
|
| Carries |
|
| Part of: | |
| Replaces |
A 1 Lenne Bridge
|
| Coordinates: | 51° 23' 33.00" N 7° 26' 31.00" E |
Technical Information
Dimensions
| total length | 195.00 m | |
| span lengths | 40.00 m - 53.00 m - 40.00 m - 37.00 m - 25.00 m | |
| bridge surface | 7 100 m3 | |
| total width | 37.61 m | |
| deck | roadway / carriageway width | 15.75 m + 14.50 m |
Quantities
| foundations | reinforcing steel | 60 t |
| total length of piles | 700 m | |
| substructure | concrete volume | 2 460 m3 |
| reinforcing steel | 290 t | |
| superstructure | structural steel | 1 650 t |
| concrete volume | 2 600 m3 | |
| reinforcing steel | 535 t |
Materials
| deck of main bridge |
composite steel-reinforced concrete
|
|---|---|
| deck of approaches |
prestressed concrete
|
Participants
Owner
Client
Structural engineering
Geotechnical/geological experts
Checking engineering
Contractor
Site supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 2010, Bundesministerium für Verkehr, Bau und Stadtentwicklung, Berlin (Germany); pp. 69-94
Internal Information
| Structure-ID: | s0043212 |
|---|---|
| Created: | 26/01/2009 |
| Last Updated: | 27/02/2013 |
